| Decoration Standards |
Metal ceilings,
grid lamps, wind port louvers, smoke detectors,
sprinklers, 75mm high elevated platform meshwork
floor, carpet, wall with timber skirting and
emulsion paint. |
| Elevators |
14 Schindler passenger elevators, among
which, 5 for the lower zone, 5 for the middle
zone and 4 for the higher zone, and 2 Schindler
fire elevators. |
| Air-conditioning System |
US TRANE central air conditioning system with a total cooling capacity of not less than 3500TR and fresh air volume of 50 cubic meter per hour. |
| Electricity System |
The total electricity capacity is not less
than 7500kV, the power supply capacity per
square meter in the office area is not less
than 0.17kV, and indoor illumination standard
is not lower than 500 lux. |
| Communication System |
There are not less than 200 telephone lines for each floor. And each floor provides arterial optical fiber cable and communication equipment to facilitate access of ISDN, ADSL, DDN broadband systems. |
| Standard Floor Loading Capacity |
300 kg/ Sq. Meter |